Front of Plant
In May, construction at the Front of Plant includes building the interior shaft walls for the receiving lift station (RLS) with rebar paneling. Shea-Parsons Joint Venture constructed the vertical shaft by installing support of excavation (SoE) as a method to support the surrounding soil, facilitating a safe and efficient work space for construction of the shaft. Second pass wall is an interior wall constructed immediately inside the SoE wall and is a part of the structural support for the shaft. The second pass wall will be the visible wall surface within the RLS shaft.