SPJV recently completed the electrical building foundation at the new Redwood City Pump Station (RWCPS). This month, SPJV will install rebar and pour concrete for the building while concurrently constructing a foundation slab nearby for the standby generator.
SPJV is also coordinating with PG&E to relocate existing overhead power lines adjacent to the RWCPS site and run as underground conduits.
Meanwhile, construction of the Belmont Gravity Pipeline is underway. This team is using a series of shafts and micro tunneling operations to install a gravity pipeline that will replace the Belmont Pump Station. Next month they will start construction on three of the eight shafts.